Concrete Footing Calculator worked example
{
"total_length": 80,
"width": 24,
"depth": 12,
"footing_count": 1,
"waste_percent": 10
}
{
"cubic_yards": 5.925926,
"cubic_feet": 160,
"with_waste": 6.518519
}
Construction
Estimate concrete for continuous or isolated footings.
Published Last reviewed
Estimate concrete for continuous or isolated footings. Enter total footing length, footing width, footing depth, identical footings, waste allowance in a purpose-built concrete footing interface designed for this subject. Length, width, depth, and count determine footing volume, converted from cubic feet to cubic yards. The result includes concrete required, volume, volume with waste, supporting detail, and clear units or diagnostics. Results depend on the entered assumptions and rounding. Check important decisions against the original records or an authoritative source. Processing stays in your browser, and UtilityPages does not store the values you enter.
Workspace
Follow the input-to-result path; the fields below remain the source of every value.
Complete the fields to prepare a result.
Enter the values above, then calculate to see a detailed result.
Length, width, depth, and count determine footing volume, converted from cubic feet to cubic yards.
Length, width, depth, and count determine footing volume, converted from cubic feet to cubic yards. Results depend on the entered assumptions and rounding. Check important decisions against the original records or an authoritative source.
{
"total_length": 80,
"width": 24,
"depth": 12,
"footing_count": 1,
"waste_percent": 10
}
{
"cubic_yards": 5.925926,
"cubic_feet": 160,
"with_waste": 6.518519
}
This tool does not store your inputs or results on UtilityPages.org.
Length, width, depth, and count determine footing volume, converted from cubic feet to cubic yards.
Enter total footing length, footing width, footing depth, identical footings, waste allowance. Use values and units from the same scenario so the result is internally consistent.
It reports concrete required, volume, volume with waste, including intermediate context where it helps you review the answer.
Results depend on the entered assumptions and rounding. Check important decisions against the original records or an authoritative source.